210805 | Flooding report Riverside - EDS 2021 | Updated | via PA21/02265

J-1760 Flood Risk Assessment – New Dwelling 13 Riverside Angarrack

Engineering and Development Solutions Ltd

Flooding report Riverside - EDS 2021

An assessment was made of the Angarrack Stream culvert capacity based on its dimensions and gradient when considering likely inlet and outlet levels from LiDAR data. The capacity was determined to be approximately 9m3/s. When considering larger order fluvial events, particularly those above the 1 in 100 year storm for the Angarrack Stream, the culvert capacity is likely to be overwhelmed. The peak flows detailed in Table 1 indicate the Angarrack Stream flows, calculated using the FEH catchment descriptors method, and give a peak flow of 11.29m3/s. This flow rate is approximately 25% higher than the capacity of the culvert. This will result in accumulation of flows at the culvert inlet headwall and overland flows towards the north and past the subject site. As such, a number of scenarios were considered in the modelling taking into account possible high flows or the culvert blocking.


Selected extracts

Rear of the existing garage location, where the ground level is lowest at 15.45m AOD

The finished flood level (FFL) for the living and sleeping accommodation will be set at a minimum level of 16.37m AOD. This is 600mm above the level of the 1 in 100 year flood event plus a 40% allowance for climate change (15.77m + 0.6m).


The access/egress route for the proposed development is off Riverside, the highway passing the front of the site. This is inundated with flood waters during all events modelled. The flood depths range from 0.18 to 0.46m with flow velocities no grater than 1.51m/s. These conditions result in ‘Danger for Most’ according to the DEFRA document FD2320/TR2 “Flood Risk Assessment Guidance for New Development”.

The nearest access to higher ground from the site is via a Public Footpath located approximately 55m to the north west along Riverside towards the Railway viaduct. It is recommended residents of the proposed development should evacuate at the earliest signs of a possible flood event occurring and well in advance of any flood taking place if safe to do so using the route demonstrated in Figure 11. If it is not safe to evacuate the property, as the living area is proposed to be located on the 1st floor, residents could safely remain on site during periods of flooding at the site during the flood events considered within this report.


An assessment was made of the Angarrack Stream culvert capacity based on its dimensions
and gradient when considering likely inlet and outlet levels from LiDAR data. The capacity was
determined to be approximately 9m3/s. When considering larger order fluvial events, particularly
those above the 1 in 100 year storm for the Angarrack Stream, the culvert capacity is likely to
be overwhelmed. The peak flows detailed in Table 1 indicate the Angarrack Stream flows,
calculated using the FEH catchment descriptors method, and give a peak flow of 11.29m3/s.
This flow rate is approximately 25% higher than the capacity of the culvert. This will result in
accumulation of flows at the culvert inlet headwall and overland flows towards the north and
past the subject site. As such, a number of scenarios were considered in the modelling taking
into account possible high flows or the culvert blocking.

 

 

 

https://planning.cornwall.gov.uk/online-applications/files/CF26844A40975...

Mitigation Measures
Access and Egress - Riverside
Fluvial Flood Extents
Fluvial Flood Extents plus 50%
Schematic overview of the model including a background LiDAR terrain model.
Catchments

Book page

TitleCreated
220714 | NHS in worst state in 74 years thanks to Tory management, says former Lib Dem MP 3 weeks 2 days agoBook page
220719 | Woman's 'life saved' by driving to London instead of waiting hours in Cornwall ambulance 3 weeks 2 days agoBook page
220720 | Cornwall Lithium borehole drilling sites on Rodda's land, Scorrier 3 weeks 4 days agoBook page
220628 | Kate Winslet's former Cornwall life in the villages of Angarrack and Tintagel 6 weeks 3 days agoBook page
220627 | 40 new homes in village | Connor Downs | and north west of Angarrack Lane, Connor Downs 6 weeks 4 days agoBook page
PA22/05411 | Outline application for 40 units with associated open space. All matters reserved except access (resubmission of PA 6 weeks 6 days agoBook page
220627| The ICS will replace Kernow CCG from July 1 to provide a single NHS voice in Cornwall 6 weeks 6 days agoBook page
220623 | George Eustice and Derek Thomas would lose seats in Cornwall if election held now, YouGov poll suggests 7 weeks 1 day agoBook page
220609 Recent Lungworm case in Hayle | Lungworm increasing threat to Cats and Dogs 9 weeks 2 days agoBook page
220301 | UK overrules scientific advice lift ban on bee-harming pesticide, Eustice not "rule out completely risk to bees" 13 weeks 6 days agoBook page
220211 | Will banned bee-killing pesticides become the new norm? | Secretary of State ignoring expert advice 13 weeks 6 days agoBook page
220505 | Prices at 'value brand' Tory minister's family farm shop dwarf supermarket rates George Eustice is 'trustee of family' 13 weeks 6 days agoBook page