151113 | Crowd-funding bid for Nautilus reef and tidal lagoon | Western Morning News
Via http://www.westernmorningnews.co.uk/Crowd-funding-bid-Nautilus-reef-tida...
Crowd-funding bid for Nautilus reef and tidal lagoon
| Posted: November 13, 2015
A Westcountry inventor plans to crowd-fund his ambitious plans for a natural reef as the precursor to building a tidal-powered energy project in the Bristol Channel.
Joe Toland, 73, intends to raise the £4million required to create an artificial shipwreck off the coast of Cornwall.
If successful, his ultimate goal is the construction of a 26-mile (42km) long, 3.7-mile (6km) wide, tidal lagoon that would provide a constant supply of renewable energy to power more than four million homes across the South West.
The former aerospace engineer, now managing director of Fast Flow Tidal Products, in Plymouth, has partnered with firms including A&P, Bisso and Pipex to manufacture and construct his design for a prefabricated shipwreck, the SS Nautilus.
"These companies offer expertise in the manufacture and assembly of non-corrosive laminated materials that would mimic the likes of girders, hull and decking on the ship," he explained.
“The completed vessel will look like a genuine open hold freighter.”
The 60 metre-long, 15 metre-high and 18 metre-wide vessel is intended as a scuba diving attraction along the lines of the former Royal Navy frigate HMS Scylla, which was scuttled off Whitsand Bay, Cornwall in 2002 and has attracted thousands of divers from around the world.
“The cost of the entire project will be £4million. Fifty per cent will qualify for government grants due to the project's green credentials and employment opportunities with the remainder via a crowdfunding scheme,” he added.
The self-described “serial inventor” is also pressing ahead with his idea for a tidal lagoon in the Severn estuary, featuring an innovative new design capable of generating twice as much power as present lagoon systems.
Using the expertise garnered from the Nautilus, the lagoon would be situated in Bridgewater Bay and be constructed in sections utilising the same prefabricated technology.
Comprising two 18-metre high, 20 kilometre-long curved walls to form an open-ended rugby ball shape with a dividing wall at its centre, the lagoon would harness the same tidal energy that allows surfers to ride the famous Severn Bore.
“This is a world's first where the wall shape specifically increases tidal flow which triggers the flow pumps,” added Mr Toland.
“Unlike other lagoon projects which are constructed from traditional, uneven rock armour, the composite materials we'll be using will form a long and curved streamlined wall - an intellectual property design we have named Jetstream - with a girder framework that allow pumps to be attached every 20 metres,” he continued.
“This encourages the tidal flow to speed up close to the wall increasing kinetic energy and pumping extra water into the dual lagoon complex.
“By keeping the water level within the lagoon - the internal head height – higher than the outside and releasing it through the turbine house we can continue to generate energy even during slack water.”
Mr Toland plans a working demonstration of the tidal-operated pumps in Hayle later this year.
- Printer-friendly version
- Login or register to post comments
- Permalink
Contributions
- Angarrack Defibrillator Team (25)
- Angarrack Inn (336)
- Angarrack Methodist Chapel (3)
- AngarrackSanta (2)
- Carol (15)
- Gail (1)
- GordonG (12)
- Hayle Development Group on Facebook (5)
- Hayle Harbour Authority (4)
- Hayle Town Council (5)
- louise (1)
- Lynne (111)
- Mal (1)
- MattBuckley66 (9)
- Neil (22)
- Neils Garden Care (9)
- Russell (21)
- Secretary - Christmas Lights (144)
- Steve (3)
- webmaster (5128)
Book page
Similar
- 151211 | Marine Renewables Business Park Complete
- 150918 | Marine renewables & marine tech businesses offered chance to move into new Marine Business Park
- 141111 | Work starts at marine renewables business park for Cornwall - Cornwall Council
- Marine Renewables Business Park
- 160901 | Sluicing again today at 10am. Around 11am tomorrow and potentially over the weekend. We can only sluice during spring t
Similar across site
- 151211 | Marine Renewables Business Park Complete
- 151113 | Crowd-funding bid for Nautilus reef and tidal lagoon | Western Morning News
- 150918 | Marine renewables & marine tech businesses offered chance to move into new Marine Business Park
- 141111 | Work starts at marine renewables business park for Cornwall - Cornwall Council
- Marine Renewables Business Park
Hayle and Angarrack news | Google
- Hayle road closures: 11 streets affected by resurfacing works - Cornwall Live
- Hayle road closures: 11 streets affected by resurfacing works - Cornwall Live
- Hayle road closures: 11 streets affected by resurfacing works - Cornwall Live
- 'David and Goliath battle' over waste site in Cornish countryside - Cornwall Live
- 'David and Goliath battle' over waste site in Cornish countryside - Cornwall Live
- 'David and Goliath battle' over waste site in Cornish countryside - Cornwall Live
- The Veterans’ Charity creates spectacular display to honour those lost on 9/11 - Cobseo - The Confederation of Service Charities
- Cancelled GWR trains 'least bad choice' after fleet problems - BBC
- Poppies made of scallop shells honour 9/11 victims in Cornwall - BBC
- Missing man sparks huge coastal emergency search - Cornwall Live
- Missing man sparks huge coastal emergency search - Cornwall Live
- Missing man sparks huge coastal emergency search - Cornwall Live
Problems within 7km of Hayle | FixMyStreet
- Trees & bushes in layby obsuring public footpath, 8th September
- Tarmac not holding manhole cover - very noisy, 31st August
- Overgrown footpath which prevens the drop kerb being used for walking aids, wheelchairs and buggies, 25th August
- Crash barrier possibly incorrectly fitted, 25th August
- Large pothole past the farm, 17th August
- Bollard broken, 16th August
Hayle News
- ???? An ???????????????????????????????????? ???????????????????????????? ???????????????????????????? of Hayle Christmas Lights will be taking place on ???????????????????????????????? ???????????????? ???????????????????????????????????? ????:??????????
- Wildanet Streetworks
- Huge thanks to everyone who submitted a vote at the Pool Party to name our lovely dolphin water refill station on King George V ...
- Road Traffic Regulation Act 1984 S.14: Temporary Prohibition of Traffic
- A post from Hayle Town Council
- Hayle road closures: 11 streets affected by resurfacing works - Cornwall Live
- Hayle road closures: 11 streets affected by resurfacing works - Cornwall Live
- Hayle road closures: 11 streets affected by resurfacing works - Cornwall Live


Recent comments
32 weeks 13 hours ago
37 weeks 14 hours ago
37 weeks 14 hours ago
52 weeks 13 hours ago
1 year 19 weeks ago
1 year 19 weeks ago
1 year 19 weeks ago
1 year 19 weeks ago
1 year 41 weeks ago
2 years 3 weeks ago